images

1 MW Hybrid Solar Plant with Battery Energy Storage System (BESS) – Ahmedabad, Gujarat

The 1 MW Hybrid Solar Plant integrated with a 500 kWh Battery Energy Storage System (BESS) in Ahmedabad, Gujarat, is designed to provide reliable, efficient, and uninterrupted power for industrial operations. By combining solar power generation with advanced battery storage technology, the project enables optimal energy utilization while reducing dependence on conventional grid electricity.

The system stores excess solar energy generated during peak sunlight hours and supplies power when solar production is low or during grid outages. This hybrid approach improves energy reliability, enhances operational efficiency, and significantly lowers electricity costs.

 

Jangid Solar

Project Infomation

Client Name

ABC Manufacturing Pvt. Ltd.

Plant Capacity

1 MW Solar + 500 kWh BESS

Project Location

Ahmedabad, Gujarat

No. of Modules

1,820 Modules (550 WP)

Project Time

4 Months

Project Type

BESS & Hybrid Solar Solution

Jangid Solar

Walk Through

Our team managed the project with a complete EPC approach, including detailed engineering, procurement of high-quality solar components, professional installation, testing, and commissioning. The system is built to withstand diverse environmental conditions while ensuring maximum efficiency and uninterrupted performance.

Jangid Solar

Complete Documentation for Your Solar Journey

Brochure Pdf

Related Document

Master Plan

Jangid Solar

Explore our office locations

Enquiry Now